SmartPM

Automated project controls and schedule analytics powered by AI-enhanced Schedule Intelligence — built for contractors, owners, and developers.

Rating
0 reviews
Pricing
Paid Free trial $12,000 / Annually (Up to 50 Projects)
Note: These products don't have any matching categories. If you think this is a mistake, please edit the details of one of the products and suggest appropriate categories.

Which is more popular?

Based on our record, Celery Project seems to be more popular. It has been mentioned 5 times since March 2021.

social mentions
5 vs 0
App Reviews popularity
100% vs 0%
alternatives listed
17 vs 46

Base details

Website, pricing, platforms and company facts side by side.

Celery Project
SmartPM
Website celeryproject.org smartpm.com
Pricing
Open source
Paid Free trial $12,000 / Annually (Up to 50 Projects) Official pricing
Company — 2016
Listed in

About Celery Project and SmartPM

In their own words, as submitted to SaaSHub.

Celery Project
SmartPM

No description of Celery Project yet.

SmartPM is an AI-augmented Automated Project Controls™ and Schedule Analytics platform purpose-built for the commercial construction industry. Powered by its Schedule Intelligence technology, SmartPM ingests native project schedule files (.xer, .xml from Oracle Primavera P6, .mpp from Microsoft...

Read more about SmartPM

Features and specs

What each product offers, as listed by its team.

Celery Project 5 features
SmartPM 15 features
  • Asynchronous Task Management
    Celery excels in managing asynchronous tasks and distributing them across multiple worker nodes, allowing for efficient task execution parallelism.
  • Supports Multiple Brokers
    Celery supports multiple message brokers like RabbitMQ, Redis, and Amazon SQS, offering flexibility to choose the best solution suited for your architecture.
  • Extensive Community and Documentation
    Being a mature project, Celery has extensive documentation and a large, active community, which helps in debugging, obtaining advice, and accessing numerous third-party extensions.
  • Periodic Task Scheduling
    Celery provides built-in periodic task scheduling similar to cron jobs, achieved via Celery Beat, enabling tasks to be executed at regular intervals.
  • High Scalability
    Celery is designed to scale horizontally, allowing you to increase throughput by adding more worker nodes to handle an increased load.

Possible disadvantages

  • Complexity in Setup and Configuration
    Setting up Celery can be complex, particularly for beginners, due to the need to configure workers, brokers, and understanding numerous configuration options.
  • Resource Intensive
    Celery can be resource-intensive, particularly if a large number of workers are used, requiring careful management of system resources and broker settings.
  • Limited Monitoring Tools
    Although there are tools and extensions available, Celery's builtin monitoring solutions may not meet all the needs for extensive task monitoring, requiring third-party integrations.
  • Database Task Backend Limitations
    Using a database as a result backend can lead to performance issues and limitations on result storage for large-scale applications, making other backend solutions, like Redis, more favorable.
  • Concurrency Management Complexity
    Managing concurrency in Celery can be intricate, requiring a deep understanding of how task distribution, workers, and broker configurations interact.
  • Schedule Quality
    Find and fix quality risks early
  • Core Analytics
    Measure health and performance across projects
  • Schedule Comparison Tool
    Track every change between updates
  • Performance Trends
    See emerging risks across your portfolio
  • Milestone Tracking
    Monitor progress on every key deliverable
  • Delay Analysis
    Quantify delay days and their true cause
  • Compression
    Spot stacking and feasibility risks early
  • Change Analysis
    Understand how changes impact project outcomes
  • Predictive Analytics
    Forecast outcomes based on real progress
  • What-if Modelling
    Test scenarios before comitting to change
  • Gantt Chart
    Visualize progress and logic in context
  • Reporting
    Generate executive reports in one click
  • Subscriptions
    Automate delivery of recurring reports
  • Executive Dashboard
    View portfolio-wide risk on one screen
  • Open API
    Connect SmartPM to your existing tools

Category popularity

How often each product is chosen within a category, 0–100% relative to the other.

Score bands 0–20 21–40 41–50 51–60 61–100
Celery Project
SmartPM
100% 100%
0% 0%
100% 100%
0% 0%
0% 0%
100% 100%

Questions & Answers

As answered by people managing Celery Project and SmartPM.

What's the story behind your product?

SmartPM's answer:

SmartPM was founded by Mike Pink, a forensic delay analyst who spent 20+ years manually analyzing hundreds of complex construction schedules for disputes and claims work on projects like nuclear power plants and wastewater treatment facilities. That manual process was slow and painstaking, so he built software to automate the analysis he'd been doing by hand for weeks or months at a time. Because the underlying problem was complex, SmartPM's earliest customers were the most sophisticated project controls teams in the industry, and the platform grew from there. Today SmartPM serves both those advanced teams through SmartPM Controls and mid-market GCs newer to schedule analytics through SmartPM Essentials, with the goal of letting a smaller contractor operate with the same rigor as an ENR Top 50 company.

What makes your product unique?

SmartPM's answer:

SmartPM is built on a proprietary CPM engine rather than a visualization layer, which means it independently recalculates and analyzes the schedule logic instead of just displaying data pulled from Primavera P6 or MS Project. That engine powers 35+ schedule quality metrics, including the DCMA 14-point check, and produces forensic-grade delay analysis that can hold up in claims and litigation. SmartPM was founded by a delay analyst with 20+ years of forensic experience, so the platform reflects patterns learned from analyzing thousands of real construction schedules rather than a generic data science approach applied to construction after the fact. It also holds FedRAMP High authorization, a rare distinction in construction technology that matters for government and federal agency work. SmartPM sits on top of existing scheduling tools like P6, MS Project, and Phoenix; it doesn't replace them, it makes the schedules already being built more useful.

Why should a person choose your product over its competitors?

SmartPM's answer:

SmartPM is chosen because its analysis comes from a real forensic delay analyst's methodology, not a generic algorithm retrofitted for construction. More than half of the ENR Top 50 and a large share of the ENR Top 100 already use the platform, which makes it a low-risk, credible choice for project controls teams. The proprietary CPM engine independently analyzes schedule logic rather than just visualizing existing data, which is what makes SmartPM's output defensible enough to use in delay claims and disputes. SmartPM also offers two tiers: Essentials for teams new to schedule analytics who want a simple, portfolio-wide view, and Controls for teams that need deep forensic drill-down. That range means a mid-market GC can get started without being locked out of the more advanced capabilities an ENR Top 100 project controls team relies on.

How would you describe the primary audience of your product?

SmartPM's answer:

SmartPM's primary audience is general contractors, particularly ENR Top 400 firms and mid-market GCs running $50M+ in annual construction volume across commercial, healthcare, education, multifamily, data center, and industrial projects. Within these firms, the platform is used by VPs of Operations, project controls managers and teams, scheduling teams, project executives, and CFOs who need visibility into schedule health and margin risk. A growing second audience is owners and developers, including real estate developers, school and hospital systems, universities, and government agencies, who use SmartPM to verify contractor schedules and get visibility they wouldn't otherwise have. A smaller audience is forensic consultants and owner's representatives at large firms who need defensible, court-ready delay analysis without doing it manually.

Which are the primary technologies used for building your product?

SmartPM's answer:

SmartPM is built around a proprietary CPM (Critical Path Method) engine that independently processes and recalculates schedule logic rather than simply rendering data from source files. The platform integrates with the scheduling and project management tools contractors already use, including Primavera P6, MS Project, Phoenix, Procore, Autodesk, Power Project, CMiC, and Power BI. It holds FedRAMP High authorization, which reflects a security and compliance architecture built to federal standards.

User comments

Share your experience with using Celery Project and SmartPM. For example, how are they different and which one is better?

Log in or Post with

Social recommendations and mentions

Recommendations tracked on public social media and blogs since March 2021.

Celery Project 5 mentions
SmartPM 0 mentions
  • Test if a celery task is still being processed
    How can I test if a task (task_id) is still processed in celery? I have the following scenario:. Source: over 4 years ago
  • how to serialize binary files to use with a celery task
    I recently integrated celery (django-celery to be more specific) in one of my applications. I have a model in the application as follows. Source: over 4 years ago
  • Django - post_init signal is called on Model instance save & before instance is even created. Why?
    I am trying to write a small application that receives video files, and convert them to a uniform format after they have been uploaded (thus added to the database). I have searched the web for the best solution for this, and have decided... Source: over 4 years ago

View more

Tracking SmartPM since Aug 2026.

Alternatives to Celery Project and SmartPM

When comparing Celery Project and SmartPM, you can also consider the following products.